Construction & Decoration
pp formwork factory in china
2017-01-09 03:48  Views:263
Price:Negotiable
Send Inquiry
General Operation And Notes Of Instrument For Building concrete Formwork:
Method of use as well as wooden formwork, hollow plastic concrete Formwork
reinforcement direction with batten direction placed in cross shaped.
No need to smear the mold release agent before using concrete Formwork.
When cast-in-place the flat plate, spacing between the keels should be 20 ~ 25 cm, and the spacing between the wall plate and keels hould be 10 ~ 20 cm.
The seam-line between concrete Formwork should be taped.
The length of nail should not be too long, generally about 30 ~ 35 mm.
The strength to drive nailsshould be moderate.
When removing the concrete Formwork, please start from the small part of one end, the support and the plates should be removed at the same time aiming at preventing the template widespread drops, don't let the corner drop on the ground vertically.
The concrete Formwork accesses to be mixed used with wood veneer, bamboo veneer and other material plate.
Contact Infomation
Send Inquiry
Company name:Beizhu Group
Status:[Offline] [Send message] [Chat]
Business contact:Jim Han(Mr.)
Telphone:
Area: Caribbean Region-Bermuda
Address:No. 10-106, Shanxi International Business Center Block A,Kangning Street,Xiaodian District, Taiyuan, Shanxi, China