Three Stage Lime Hydrator for Metallurgy
2017-01-14 08:36  Views:123
Price:Negotiable
Brand:luxing
Send Inquiry
Application fields:
It’s widely used in lime factory production line, iron and steel works, desulfurization, sewage treatment as well as high quality hydrated lime making.
Qualification and working principle:
Controlling the quicklime’s reaction time (8-15 minutes) in the container and fully hydrated the quicklime.
Make full use of the heat generated during the reaction time.
Raise the inner temperature to 60? by 3-5 minutes and make the quicklime fully hydrated.
Process of material feeding control
Scientific distribution of water consumption
Dust removal
Meet your requirements for different purity of lime emulsion.
Technical parameter:
Output: 1-30 ton/hour
Conversion rate: >96%
BET: standard
Residual moisture: <1%
Dustiness: <30mg/CBM
Standard consumption
Material demand: 0.75ton quick lime / hydrated lime
Water demand: 0.5cbm / hydrated lime
Power consumption: 4kWh/ton
Contact Infomation
Send Inquiry
Company name:Anhui Luxing Environmental Engineering Technology Co., Ltd.
Status:[Offline] [Send message] [Chat]
Business contact:Tina yao(Mr.)
Telphone:
Mobile:
Fax:
Area: Caribbean Region-Bermuda
Address:jiangpu road