Brand:1
Model:1
MOQ:100 Pieces
Send Inquiry
Wallpaper Manufacturers, Wallpaper Suppliers, China Wallpaper, Custom Wallpaper, Wallpaper china www.wallpaper-manufacturers.com nail holes with putty fill level. Full putty, polished smooth. (3) Primary gypsum board: gypsum board joints with caulking putty treated with joint tape firmly affixed. Surface putty. Brushing primer is generally used 107 glue, primer again survived, but can not have missed. 2. To prevent the wallpaper, wall coverings damp off, brushing a layer of moisture-proof coating. 3. Bomb vertical and horizontal lines, in order to ensure the wallpaper, wall coverings smooth vertical and horizontal pattern right basis. 4. Plastic wallpaper glue water expands, so use moist paper, plastic wallpaper fully inflated, the glass fiber base wallpaper, wall coverings, etc., no water stretching, no run paper. Composite paper wallpaper wallpaper and textile fibers and it is not boring water. 5. After pasting wallpaper adhesives rush pressure, can not leave the bubble, the extruded plastic to timely Kaijing. (Iv) Notes 1. Primary wall moisture content should be less than 8%. 2. Wall roughness reached by 2 meters by foot inspection, not more than 2 mm height difference. 3. When the first of the patchwork pattern, after the patchwork, the upper and lower pattern match. 4. Prohibition in the sun angle at the patchwork, wallpaper to wrap over the sun angle of 20 mm. 5. When laminating a nonwoven glass fiber wall covering and wall coverings, adhesives can not brush the back, the figurines will brush the adhesive base.