Metallurgy, Mineral & Energy
solar screw piles
2016-09-25 08:34  Views:134
Price:0.00 USD/-
Brand:-
Model:-
MOQ:-0 -
Send Inquiry

Reduction of Construction Duration. Cutting down labor cost and construction dulation are reduced due to no need of curing after work. 

Unnecessary of Concrete. It is eco-frindly construction method not using concrete. 

Unnecessary of Disposal of Surplus Soil. Disposal of surplus soil is not required due to not using excavating work. 

Possible to Reusing. It is possible to install the other place or demolish because it can be pull out by back lashing easily. 

Contact Infomation
Send Inquiry
Company name:sungbocheng
Status:[Offline] [Send message] [Chat]
Business contact:cheng xian yi (Ms.)
Telphone:
Fax:
Area: Caribbean Region-Bermuda
Address:Kim Dong beautiful maritime 973-16
Zip:264002