seaming machine
2016-10-02 22:26  Views:153
Price:630.00 USD/Sets
Brand:Shenhua
Model:LC3000C
MOQ:1 Sets
Send Inquiry

 

LC3000C PVC welding machine can also be called hot air welding machine, 

 

hot air welder, hot air tool, PVC welding machine, Banner welding machine, It used to weld advertising inkjet fabric ,printing cloth ,PVC, PE ,Tent, Tarpaulin and other plastic materials without glue.

Characteristical of LC3000C PVC welding machine 

High Cost Effective,Durable type
1.Adopt the digital constant temperature technology and industry temperature control board and equipped with feedback sensor,that can control the temperature fluctuation in 1 degree
2.The heater is import Leister,Its lifetime can reach4-5years and need change any parts.
3. Adopt the AC motor.the wind is stronger and the lifetime is longer.Have the laser positioning line and handrail.Welding more perfect,the use of more convenient.
4.Package with Aluminum,better protection ,more beautiful and more convenient to carry.

Main technical Main technical of LC3000C PVC welding machine

 

1. Model Number: LC-3000C

2. Rated voltage: 110-240V

3. Power: 1800W

4. Frequency: 50HZ

5. Temperature range:20-700 degree

6. Speed scope:2-8m/min

7. welding thickness:0.2-1.8mm

8. welding width:3-4cm

9. temperature fluctuation:1

10.heater strip:leister

1. General instruction for safety:

Warning: The basic principal of safe protection should be followed to reduce the danger of fire in disaster, electric shock and personal harm. Please pay attention to the following items carefully before operation.

 

1. Keep the working place clean. Messing up and the disorderly working place cause disaster 

2. Choose the work place carefully and use the machine in a bright and dry circumstance.

3. The electricity, controlling box and protective facilities have to be in the proper order after finishing daily work. The electrical power supply has to be switched off definitely.

4. The machine has to be stopped before gets maintenance or replacing the parts.

5. Use standard or indicated tools when dismantling or replacing parts.

6. For safety and the long life of the machine, please do not let the machine operates overtime.

7. If any special incidents happened, please stop the machine first for repairing, And do not deal with the special incident with improper procedures.

8.  If the machine is operated on land, keep the work place clean and no dust there. If dust or something blocks the inhaling filter of heater, the heating wind can not come cut adequately and then temperature inside of filter will rise to let the heater burn down.

 

3 Moving,Dismantlement,Installation,Cleaning:

1. Any part of this machine being bumped of fallen can cause some damage impossible to be repaired.So please pay attention to carry it.It is suggested to move the machine by manpower and put it down carefully.

2. Please check if there is damage or missed parts after unpack the machine.Any problem, please contact us or the local agent immediately.

3. The place for installation must be flat and the floor is strong enough to support the machine and moreover, the installation place should close to power supply.

4. Keep the installation place no dust and avoiding sunshine.

5. Please sweep away the anti-rust oil from the machine with detergent and re-lubricate with light lubricating oil after installation.

 

4 Connecting the power supply:

Connecting the electric wire to the reserved plug(AC220V)of controlling box.

5 Operation:

1. Make the cloth for seaming flat and put it underneath.Fix both ends by adhesive tape or something else.

2. The overlap width of the two pieces is about 3-mm, the width of the nozzle of hot seaming machine.

3. Put the machine nozzle between two overlap pieces.The press-wheel should be at left side of nozzle.The nozzle also need align with side of upper piece of cloth.

4. Switch on the motor power and then adjust speed.

5. Turn on the movement switch.

6. Press heating power key to adjust temperature.

7 Turn the bar by anticlockwise to fix the position to startup automatic movement.The machine will go along with the overlap path by itself.

8. Turn the bar by clockwise to cease the automatic work.

9. The operator should control the moving direction and make sure the nozzle connect both with upper and under piece of cloth.

 
Contact Infomation
Send Inquiry
Company name:ZHENGZHOU SIXTH GREAT CO., LTD
Status:[Offline] [Send message] [Chat]
Business contact:Alice zhang (Mr.)
Telphone:
Mobile:
Fax:
Area: Caribbean Region-Bermuda
Address:NO.79 JingSan Road Zhengzhou City China
Zip:450003