Brand:-
Model:-
MOQ:-0 -
Beautiful Appearance Easy to Dismantle Waste Water Storage Tanks AWWA D103 Stankdard
Brief introduction
Our Waste Water Storage Tanks are glass fused to steel tank The sheets are bolted together and tighten by a highly resistant silicone or polyurethane mastic sealant. The enameled sheets are baked in a high temperature to achieve fusion of glass and steel. The combination of the two material make an excellent corrosion resistance of the tank . It is a competitive, long-term technical solution for process water and waste water storage.
Tank Performance
Item | Glass fused to steel tank |
pH Range | 1~14 |
Impact Resistance | Excellent |
Weather Extremes | excellent |
Erection Time | short |
Freight Cost | low |
Relocation Capability | yes |
Advantages
- Long-lasting service life ,more than 30 years
- High resistance even against corrosive effluents, good chemical resistance
- Glass-fused-to-steel tanks are available in various colours for better integration into the landscape
- Eeasily transportable, Short delivery time. The modular, bolted tank construction principal allows the factory quality finished panels to be economically shipped to site and erected within very tight timescales.
- Minimum assembly time
- Flexibility to Re-Model, Extend, Dismantle and Re-Site, improving residual value
Various roof options
- Center Enamel Offers a wide range of roof options, including
- glass-lined steel roof
- GRP (Glass reinforced plastic) roof
- flat aluminium roof
- polycarbonate roof
- gas holder(Single membrane / double membrane roof).
- Trough deck
Installation
Reference project
Mining waste water Shanxi province,China | 1 set of hydrolyzation tank Ø16.81×4.8 M 1 set of secondary sedimentation tank: Ø18.33×3.6 M 1 set of sedimentation tank : Ø7.64×4.8 M 2 sets of biological aerated filter : Ø6.11×6 M installation: 10 workers18 days |
Municipal sewage project,China | daily treatment 9000T 2 set of hydrolysis reactor Ø15.28×6M 3 sets of contact oxidation tank Ø15.28×4.8M 2 sets of sedimentation tank Ø15.28×3.6M Total volume : 7000CBM,Installation: 12 workers, 20 days |
Beijing Olympic Games sewage treatment system | 4 sets of enamel tank Ø18.33×3.6M,1 set of enamel tank Ø4.82×3.6M Total volume 5200m3,installation: 12 workers,18 days |