Sewage treatment tank, above ground storage tanks AWWA D103 Standard
2016-10-03 22:58  Views:240
Price:0.00 USD/-
Brand:-
Model:-
MOQ:-0 -
Send Inquiry

Beautiful Appearance Easy to Dismantle Waste Water Storage Tanks AWWA D103 Stankdard

 

Brief introduction

Our Waste Water Storage Tanks are glass fused to steel tank The sheets are bolted together and tighten by a highly resistant silicone or polyurethane mastic sealant. The enameled sheets are baked in a high temperature to achieve fusion of glass and steel. The combination of the two material make an excellent corrosion resistance of the tank . It is a competitive, long-term technical solution for process water and waste water storage.

 

Tank Performance

Item Glass fused to steel tank
pH Range 1~14
Impact Resistance Excellent
Weather Extremes excellent
Erection Time short
Freight Cost low
Relocation Capability yes

 

Advantages

  1.  Long-lasting service life ,more than 30 years
  2.  High resistance even against corrosive effluents, good chemical resistance
  3.  Glass-fused-to-steel tanks are available in various colours for better integration into the landscape
  4.  Eeasily transportable, Short delivery time. The modular, bolted tank construction principal allows the factory quality finished panels to be economically shipped to site and erected within very tight timescales.
  5.  Minimum assembly time
  6.  Flexibility to Re-Model, Extend, Dismantle and Re-Site, improving residual value

 

Various roof options

  •  Center Enamel Offers a wide range of roof options, including
  •  glass-lined steel roof
  •  GRP (Glass reinforced plastic) roof
  •  flat aluminium roof
  •  polycarbonate roof
  •  gas holder(Single membrane / double membrane roof).
  •  Trough deck

 

Installation

 

Reference project

Mining waste water Shanxi province,China

1 set of  hydrolyzation tank  Ø16.81×4.8 M
1 set of secondary sedimentation tank: Ø18.33×3.6 M
1 set of sedimentation tank : Ø7.64×4.8 M
2 sets of  biological aerated filter : Ø6.11×6 M
installation: 10  workers18 days

Municipal sewage project,China

daily treatment 9000T

2 set of  hydrolysis reactor  Ø15.28×6M

3 sets of contact oxidation tank  Ø15.28×4.8M

2 sets of  sedimentation tank Ø15.28×3.6M

Total volume : 7000CBM,Installation: 12 workers, 20 days

Beijing Olympic Games sewage treatment system

4 sets  of  enamel tank  Ø18.33×3.6M,1  set of  enamel tank  Ø4.82×3.6M

Total volume  5200m3,installation: 12  workers,18 days

Contact Infomation
Send Inquiry
Company name:Center Enamel Co.,Ltd
Status:[Offline] [Send message] [Chat]
Business contact:melody wong (Ms.)
Telphone:
Mobile:
Fax:
Area: Caribbean Region-Bermuda
Address:Fuli Commercial Center room 301#, Xingang West Rd.11
Zip:510000