Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine
2016-10-04 10:26  Views:214
Price:0.00 USD/-
Brand:-
Model:-
MOQ:-0 -
Send Inquiry

Lightweight concrete Block AAC Block Machine / AAC Fly ash Block machine

 

 

AAC Block Equipments, Aerated Concrete Block Making Machine 300,000m3/year, 200,000m3/year, 150,000m3/year, 100,000m3/year,etc

 

AAC Block forming process

1 The Preparing of Raw Materials

A) The Preparing of Slurry

B) The Preparing of Lime

C) Cement

D) Stone Powder

E) Waste material

2. Batching, Mixing, Pouring

3. Resting and Pre-curing

4. Demoulding, Cutting, Grouping

5. Curing, Finished Product Leaving Autoclave

6. The Reclaim System of Waste Water & Slurry

 

Planning and Design:


 Factory covers an area of 15000m2 or so.

 There should be raw material area, finished block area and production area. Production process includes raw material disposal, rated material pouring, curing, cutting and steaming procedure.
 From building foundation to equipments installing and testing, to trial producing, it will take 4-5 months.  

 

 

 

Material:


1. Fly ash: get dry ash from power plant
2. Cement: cement in bulk
3. Lime, gypsum and aluminum powder (buy in local area)

 

Water, electricity and steam supply


1. Water supply: build a well or use waste water
2. Electricity supply: install a 315kv transformer

 

 

 

 

 

Contact Infomation
Send Inquiry
Company name:Changzhou Mingjie Building Material Equipment Manufacturing Co.,Ltd
Status:[Offline] [Send message] [Chat]
Business contact:Peter.Fly (Ms.)
Telphone:
Mobile:
Fax:
Area: Caribbean Region-Bermuda
Address:No.32.Xinglong Road,Xin Zha Town,Changzhou,Jiangsu,China
Zip:213000