Brand:-
Model:-
MOQ:-0 -
Send Inquiry
ASTM A240 JIS G4304 DIN17460 Stainless Steel Circles , Dia 115mm-560mm
Quick Detail:
stainless steel 201 circle
1. Standard: ASTM A240, JIS G4304, G4305, GB/T 4237, GB/T 8165, BS 1449, DIN17460, DIN 17441
2. Grade: 200series&300series&400series
3. Thickness: 0.23mm-0.8mm
4. Diameter: 115-560mm
5. Length: according buyer require
6. Surface finish: 2B, BA, 8K, 6K, Mirror Finished, No1, No2, No4, Hair Line with PVC
7. Manufacture technology: cold drawn/cold rolled/hot rolled
Applications:
| Surface Finish | Definition | Application |
| 2B | Those finished, after cold rolling, by heat treatment, pickling or other equivalent treatment and lastly by cold rolling to given appropriate luster. | Medical equipment, Food industry, Construction material, Kitchen utensils. |
| BA | Those processed with bright heat treatment after cold rolling. | Kitchen utensils, Electric equipment, Building construction. |
| NO.3 | Those finished by polishing with No.100 to No.120 abrasives specified in JIS R6001. | Kitchen utensils, Building construction. |
| NO.4 | Those finished by polishing with No.150 to No.180 abrasives specified in JIS R6001. | Kitchen utensils, Building construction, Medical equipment. |
| HL | Those finished polishing so as to give continuous polishing streaks by using abrasive of suitable grain size. | Building Construction. |
| NO.1 | The surface finished by heat treatment and pickling or processes corresponding there to after hot rolling. | Chemical tank, pipe |
Specifications :
| Type | Stainless steel circle(cold rolled ) |
| Thinckness | 0.23mm-0.8mm |
| Diameter | 115mm-560mm |
| Quantity | as customer's requirement |
| Finish | 2B,BA,HL,MIRROR,NO.1-NO.4,8K,and so on. |
| Standard | ASME, ASTM, EN ,BS,GB,DIN, JIS etc |
| Material | 201,202, 301,304,410,430,409 |
| Application range | Foodstuff, Gas, metallurgy, biology, electron, chemical, petroleum, |
| boiler, nuclear energy, Medical equipment, fertilizer etc | |
| Package | Standard export sea-worthy packing |
| Delivery time | 7-15 days |
| Quality | No.1 |
| Productivity | 3000-4000 tons/month |




