Pipe Fittings
Handrail Base Cover(YK-9481)
2016-10-23 11:44  Views:293
Price:Negotiable
Send Inquiry

 

base Cover(YK-9481)

JINXIN Products:

Product Name:

base Cover

Model Number:

YK-9481

Material:

High-quality 304/316 Stainless Steel 

Finish:

Polished into SSS/PSS/PVD

Application:

Handrail Set/ Handrail Pipe/Handrail System

Feature:

Made by Stainless Steel 201/304/316,Wood, Crystal

Specification:For the Dia:38.1mm/42.4mm/48.3mm/50.8mm Pipe

Port:

Guangzhou/Shenzhen

Packing:

Each packed in brown box,40 boxes in one carton

Minimum Order Quantity:

30 Piece/Pieces

Delivery Time:

10~30 days

Payment Terms:

T/T,Western Union

Supply Ability:

10000 Piece/Pieces per Month

 

Suitable for office, super market, and apartment and so on.

 

 

 

 

JINXIN Advantages:

1)Various kinds for customer selection(More then 500pcs different casting moulds)

2)Complete modle for client choice:1/4”,1/2”, 1”, 11/2”,2”, 3”, 4”, 42.4,50.8 

3)Professional experience and support special design (AUTO CAD & 3D)

4)Tailer Made(Offer the special design of your requiretments)

5)Competitive price with more discount(Real Manufactory)

6)Excellent quality control(100% check one by one)

8)In time delivery(15-30days after payment)

7)Good service before and after sales

9)OEM, ODM is acceptable

 

JINXIN Packaging Show for you:

 

 

 

 

 

JINXIN Basic Information:

Quotation

FOB Guangzhou Port of China,included all packing cost except special requirement.

Material:

All products are made by stainless steel 304 and 316. 

We can offer original Material Test report for refer.

Packing Details:

Each type of product is packed in separate inner boxes.

Each outer box weight is not over 20kgs.

Packing Marks:

Each carton indicates properly the pallet number,box number and 

code number of the product it holds,material type(AISI 304/306) and inside quantity.

Delivery:

In oder to be in a position to in form the shiping agent accordingly, 

when goods are ready for shipment,we will send all details of the merchandise

 such gross and net weight,number of boxes/pallets and overall dimensions to client.

Delivery Time:

15~45 days afer receipt of advance payment.

documents Offered:

For shipment: 

Original Bill Of Loading

Original Invoice

Original Packing List

Payment Term:

30~50% in advance as deposit. Other balance is paid before delivery and shipment.

Bank information:

 

Company:JINXIN HARDWARE PRODUCT LIMITED

Beneficiary’s A/C NO:440449559838

Bank Code:004

SWIFT Code :HSBCHKHH

 

 

 

Any question about our factory and products, welcome you contact with our staff:
--
JINXIN Decorative Hardware Products Manufactory
WEB: www.doorware.net
ADDRESS: Dayun Industrial Area, Pingbu Road, Shiling Town, Huadu District, Guangzhou, China. 

Contact Infomation
Send Inquiry
Company name:Guangzhou City Huadu District Shiling Jingxin Hardware Products Manufactory
Status:[Offline] [Send message] [Chat]
Business contact:Ronghua Liang(Mr.)
Telphone:
Mobile:
Fax:
Area: Caribbean Region-Bermuda
Address:Dayun Industrial Area, Pingbu Road, Shiling Town, Huadu District