Pipe Fittings
Manifold
2016-10-24 02:40  Views:235
Price:Negotiable
Send Inquiry

1. No leakage: The plastic manifold's branch pipe and balancing valves are mounted together, instead of the brass thread screw nut.

2. Low price: Using the PPR material instead of the brass, the cost is cheaper than brass manifold. Insert method: The floor heating pipe can be inserted into the valves. The diameter is big. Convenient installation, easy disassembly.

3. Long life span: 50 years the same as the plastic pipe life an normal condition.

4. Anticorrosion: Anti-rust, healthy pipe, thermal insulation, energy saving.

Contact Infomation
Send Inquiry
Company name:Hebei Ritai Original Pipe Co., Ltd.
Status:[Offline] [Send message] [Chat]
Business contact:Cherry Sun(Mr.)
Telphone:
Mobile:
Fax:
Area: Caribbean Region-Bermuda
Address:No.2 Beigang Street, Haigang District,Qinhuangdao City