Metallurgy, Mineral & Energy
Flanges
2016-10-25 05:32  Views:276
Price:Negotiable
Brand:JinhaiPump
Model:K1302
Send Inquiry

 

 

OEM casting

According to the customer’s drawing and requirements

Course of production

Model making→Molding/Core→Mold assembling→Melting→Pouring→Opening→Finishing→Heat treatment→Non-destructive→Inspection→Welding→Test

Standard

GB/1135.2-89

Authentication Conditions

Have passed ISO9001:2008 certification

Casting process

Sodium silicate sand,  Resin sand

Our Material

Plain carbon steel, Low alloy steel, High manganese steel, High chromium cast iron(No more than 35 tons)

Casting Products

mud/ slurry pump castings (low alloy steel/ high chromium cast iron ),low-alloyed steel tube mould steel castings,engineering machinery steel castings,colliery/ mining/ building materials /machinery steel castings,die casting machine steel castings,chonghuagong machinery steel castings,wind / electric equipment steel castings and so on.

Inspection

Equipment

German direct-reading spectrometer, Ultrasonic detectors, HX-MIAS, Leeb hardness tester, Testing center, Large processing equipment etc.

Production Equipment

Two 8T-EAFs, 20T-finery, Shot blasting room, Carbon arc gouging welding,

Two trolley type resistance furnaces, 300m³ heat treatment pool etc.

Surface treatment

Anti-rust oil, powder coating, epoxy spray coating, anodic oxidation treatment, plating or as per requirements

Packaging

Wooden case, crate, parcel, bale, package, barrel, etc.

 

 

Casting

OEM service

Material: Plain carbon steel, Low alloy steel, High manganese steel, High chromium cast iron

Process: Sodium silicate sand casting, Resin sand casting ,Hot modulus method and so on

Standard:  GB/1135.2-89

Weight range: 500kg-35ton

Casting process: client drawings—pattern—raw casting—machining—packing—delivery.

 

 

Casting quality control system

 

1. Drawing control

Confidentiality–Be confidential to the customers’ drawings.

Check- Technician checks the drawings and confirms dimensions

Confirmation – Confirm the production process & inspection process according to the drawings

2. Mould making control

Inspect the dimensions and material according to drawing.
Send test reports and photos to customers.

3. Raw Casting control

Produce according to the production tracking form

Use advanced inspection equipments to ensure internal quality of the product.

Check the test bar and record relevant information to each bulk.

Send the photos and test data of each step to customers.

4. Machining process control

Produce the samples according to the confirmed casting process.

Train the relevant staff before producing according to the machining and inspection process.

Our inspector will track the quality and time of the products during producing. Any problems on quality and process must be feedback to our customers.

Do the finial inspections to the products and send the relevant data and finished product photos to the customers.

5. Packing and Delivery control

Determine the size & material of the box according to the shape & number of products.

Taking different anti-rust protection to products according the delivery time

Put dimensional reports, chemical & mechanical documents, test bar and photos into the packing box

Send the photos of whole packing process to customers.

 

 

 We are manufacture which mainly produces mud/ slurry pump castings chromium cast,low-alloyed steel tube mould steel castings,engineering machinery steel castings,colliery/ mining/ building materials /machinery steel castings,die casting machine steel castings,chonghuagong machinery steel castings,wind / electric equipment steel castings and so on. We can also supply you other castings according to your requirements.

We promise to supply you perfect design, professional quality control, competitive prices and excellent after-services

Contact Infomation
Send Inquiry
Company name:Xuzhou Zhongkuang Jinhai Pump Co., Ltd.
Status:[Offline] [Send message] [Chat]
Business contact:zkjh by(Ms.)
Telphone:
Fax:
Area: Caribbean Region-Bermuda
Address:No.2, East of Longhai Road, The Third Industrial Park, South of Gaojiaying, Tongshan New District