Model:Thinktop-0442
Details about rubber pipe grommet :
| Strength of NBR Material | |||
| Animal and Vegetable Oil Resistance | excellent | Water Resistance | good |
| -Aliphatic | excellent | Alcohol Resistance | good |
| Wear Resistance | excellent | Alkaline Resistance | good |
| Elongation | good | Thermal aging resistance | good |
| Elasticity | good | Chemical resistance | good |
| Tear Resistance | good | Tensile Strength | good |
| Impact Strength Resistance | good | Acid Resistance | good |
| Gas Tightness | good | -Aromatic | suitable |
| Oil and Fuel Resistance | good | ||
1. Materials: comply to ROHS, Buna-N, or Silicone (VMQ), EPDM, Viton, etc.,
2. Hardness: 20 to 90 shore A, tolerance can be ±5 shore A, for some special products, we can reach ±3 shore A tolerance.
3. Tolerance: strictly upon ISO 3302-1:1996(E) M-Class or as your requested.
4. Color: black, transparent, green, red, yellow, grey, purple, pink or as your requested.
5. Can provide control plan, material test report, dimenstional test report and other documents.
6. Applications: automobile, electrical appliance, mechanical, industrial, construction, household, medical and other fields.
7. Packing: PE bags inside, strong carton and PE film paper packed outside with water proof.
Capability of our workshop:
1. ISO9001:2008 certificated factory.
2. Mix materials in house professionally.
3. We have our own mold workshop. 6 CNC machines, 2 EDM machines and computerized machining machines.
4. 20 sets of compression machines and 2 sets of injection machines to run mass production.
5. 2 sets of advanced trimming machines to assure non-flash products.
6. 20 QC technicians and 6 R&D engineers, strict quality control and assurance system to assure high quality products.
7. Lead time: 3~10 days.
8. High efficient management to achieve the production cost optimization.
Our advantages:
1. We have our own professional mold and rubber workshop to help you make new molds and run mass production.
2. Strong QC and R&D teams to assure high quality proudcts.
3. Quick shipment (tooling:7-10 days, mass production 1-2weeks).
4. Experienced sales representatives follow up your new projects with high efficiency.
5. Small order quantity is welcomed.




