Model:LL-2800-6600
1) The model and capacity:
NO. | Model | Reactor size | weight | volume | capacity | Note |
1 | LL-2200-6000 | 2200*6000mm | 27MT | 23 M³ | 5 MT/Batch | 3 batches 2days |
2 | LL-2200-6600 | 2200*6600mm | 29MT | 25 M³ | 6 MT/Batch | 3 batches 2days |
3 | LL-2600-6000 | 2600*6000mm | 32MT | 32 M³ | 8 MT/Batch | 1 batch 1 day |
4 | LL-2600-6600 | 2600*6600mm | 34MT | 35 M³ | 9 MT/Batch | 1 batch 1 day |
5 | LL-2800-6000 | 2800*6000mm | 35MT | 37 M³ | 10 MT/Batch | 1 batch 1 day |
6 | LL-2800-6600 | 2800*6600mm | 38MT | 41 M³ | 12 MT/Batch | 1 batch 1 day |
2) Fuel
The fule can be :fule oil, heavy oil, coal, firewood.
3) The processing time:
NO. | Model | Feeding time | Processing time | Cooling time | Discharge carbon time |
1 | LL-2200-6000 | 1-2 hours | 7-9 hours | 2 hours | 1-2 hours |
2 | LL-2200-6600 | ||||
3 | LL-2600-6000 | 2-3 hours | 10-12 hours | 2-3 hours | 2-3 hours |
4 | LL-2600-6600 | ||||
5 | LL-2800-6000 | 3-4 hours | 12-14 hours | 3-4 hours | 3-4 hours |
6 | LL-2800-6600 |
4) End product percentage(for example :the raw material is tyre)
Fule oil | Carbon black | Steel wire | Waste gas |
45% | 35% | 10-12% | 8-10% |
5) Machine motor Power
NO. | Model | Speed reducer | Fan | Blowers | Oil pump | Water pump |
1 | LL-2200-6000 | 3KW | 4KW | 1KW | 1.5KW | 1.5KW |
2 | LL-2200-6600 | 3KW | 4KW | 1KW | 1.5KW | 1.5KW |
3 | LL-2600-6000 | 5.5KW | 7.5KW | 1KW | 1.5KW | 1.5KW |
4 | LL-2600-6600 | 5.5KW | 7.5KW | 1KW | 1.5KW | 1.5KW |
5 | LL-2800-6000 | 5.5KW | 7.5KW | 1KW | 1.5KW | 1.5KW |
6 | LL-2800-6600 | 5.5KW | 7.5KW | 1KW | 1.5KW | 1.5KW |
6) Containers:
NO. | Model | 40HQ | 40FR open container |
1 | LL-2200-6000 | 2 | / |
2 | LL-2200-6600 | ||
3 | LL-2600-6000 | 1 | 1 |
4 | LL-2600-6600 | ||
5 | LL-2800-6000 | ||
6 | LL-2800-6600 |
7) The machine installation
We will give the foundation drawings to buyer after make the order .we will send engineer when buyer get the machine. The engineer mainly install the machine and training your workers.
8) catalyst formula:
we will supply the catalyst formula after you order the machine,you can buy it at your local.
9) Delivery time:
We will delivery the machine within 15-25days after get the advance payment(30% of the total amount).
10) Payment:
TT & ESCROW & L/C
11) FOB Port (China):
FOB lianyungang port or qingdao port.