Brand:Qianyu
MOQ:1
Production flow:
1. The raw materials store in the material storehouse (or storesthe pot) after dealing with reserve such as lime, cement, gypsum,sand (or fly ash).
2. Aluminum powder or aluminum lotion is through dealing withthe reserve material for use.
3. Raw materials measure according to certain matching byelectron balance measure, aluminum powder, water put into aluminumpowder mixer is it is it suspend the liquid to make to mix aftermeasuring.
4. The batching water (cold water or hot water pitcher hotwater) is measured by the electronic water balance.
5. Put into and pour among the mixers in certain order after,raw materials, aluminum powder suspend the liquid is measured, pourand enter the mould after mixing evenly (panel should be putnetwork slice of reinforcing bar in advance in the mould).
6. Quiet to is it raise in advance to park through certaintemperature and time, is it transport to the cutting machine tohang from upset hoist upset 90° After the base body reaches certainintensity, the drawing of patterns is cut:
A. The base body carries on the side and cuts and mills the troughvertically
At first.
B. Then carry on the vertical level to cut.
C. Cut horizontally finally.
D. Cut good base body, raises to cauldron car go on one yard ofshelves,
Organize into groups to steam to transport to hang to drive avehicle to load.
7. Raise products well, produce after the cauldron breaking theboard off with the fingers and thumb by the board breaking off withthe fingers and thumb machine to steam.
8. Pile from finished product hoist or forklift to finishedproduct field pile the buttress according to specification tocarry.
9. Steaming and raising the car and side board and entering thenext board of circulation and returning after, the finished productis unloaded, with upset hoist mould frame association that drawingof patterns get off, restore 90°.
Return to pour mixer pour again after clearing up.



