Brand:HBCS
MOQ:600
Quantity:100
waterproof material is a new waterproof material instead of asphaltfelt ,it is non-pollution ,no flowing,no brittle .
waterproof material
1) name : SBS waterproofmembrane
2) material : SBS uses polyesteror fiberglass as the original source, with SBS compound as themodifier, and covers the insulation materials as, sands, gravelspieces, which also has good quality and function in coterie
3) Surface : PE membrane or mineralgranules /slates or aluminum foil or Fine sands
4) size : waterproof membrane
Name | width(m) | Length (m) | Thickness | weight |
SBS modified Asphalt waterproof Membrane | 1m | 10m | 2mm | 28kg/roll |
SBS modified Asphalt waterproof Membrane | 1m | 10m | 3mm | 41kg/roll |
SBS modified Asphalt waterproof Membrane | 1m | 8 m | 4mm | 48kg/roll |
SBS modified Asphalt waterproof Membrane with mineral granules | 1m | 10m | 2mm | 32kg/roll |
SBS modified Asphalt waterproof Membrane with mineral granules | 1m | 10m | 3mm | 43kg/roll |
SBS modified Asphalt waterproof Membrane with mineral granules | 1m | 8m | 4mm | 50kg/roll |
SBS modified Asphalt waterproof Membrane with aluminum oil | 1m | 10m | 2mm | 28kg/roll |
SBS modified Asphalt waterproof Membrane with aluminum oil | 1m | 10m | 3mm | 41kg/roll |
SBS modified Asphalt waterproof Membrane with aluminum oil | 1m | 8m | 4mm | 48kg/roll |
5) Scope of Application: basement and roofing of key waterproofengineering, general and civil engineering. / Bridge, road,granary, tunnel, park, swimming pool, sewage purifying pool andothers. Especially adapting to the waterproof of structurechangeable and cold area.
6)Installation: Heating to melt, place the membrane correctly,fire torch, evenly heat the membrane and foundation, when thesurface of the membrane is black and bright with a fusion layer,apply the membrane and press it into a solid and flat state. Borethe membrane is cool, seal the edge of joint by float.
7) Advantages :. Good ability of anti-aging, anti-alkali,resistant to low temperature. High tensile strength andenlongation, which adapts to the contraction or crack of thebase.
Construction Requirement basement Treatment
7) pakcing : pallet or as to customer request .
8) shipping : 10days after receive down payment .
SBS waterproof material




