Construction Machinery
Rail Spike Anchoring Agent mortar for Russia Railway concrete sleeper
2016-12-19 04:52  Views:372
Price:0.00 USD/Negotiable
Send Inquiry

Description:

1:Rapid hardening , high strength, micro-expansion , coldconstruction operation .
2:Environmental pollution

Rail Spike Anchoring Agent mortar for Russia Railway concretesleeper

Description:

The product is inorganicmixture, fast harden High intensity micro-expansion,Environment-friendly. do not need to warm up in normal condition(20°C68°F 70 % Humidity). Mixed with water is available. Avoidcrack due to partial warmed, which reduce the working time of railspike.  Constriction at -10°C 14F is available. Wellperformance after 2 million times destructive test 

Applications:

1, It can be used in railway:rail spike anchoring of the concrete railroad crosstie crosstieof bridge. It can be used in anchoring of installed bridge bondedjoined and the foundation bolt of instrument.2, It can be used in railwaytunnel channel coal mine   Strengthen of bridge pier  anti-crack of house metallurgic mine etc. fastconstruction for anchorage of underground construction with anchoring component. In order prevent stone drop.3.It can be used in theStrengthen of the concrete construction with reinforcing steel bar.And satisfy the weld of the reinforcing steel bar.

Specifications:

Vertical Expansion Rate(%)

CompressiveStrength(Mpa)

Rail spikepull-out resistance(KN)

4hours

1day

3days

≥0.02

>20

>35

>50

>60

Standard :TB/T2093-2002

How toUse?

No.

Steps

Tools

Requirementsof Construction

Remarks

1

Takeout the old rail spike

specialtools

1.take out the old spike

2.Cleaning the hole of the rail spike.

It’sbetter to wet the hole with water

2

Setthe shelf of anchorage

stick

putthe shelf of anchorage into the hole

 

3

Mixing

Containerspoonbucket

Mix 14-16% waterwith the anchoring agent,   mixevenly

Add orreduce water accordingto  situation  

4

Grouting

spoon

Groutingthe mixed anchoring agent into the hole from the middle of theshelf of anchorage. 2cm to the top of the hole it’sbetter.

 

5

Put  therail spike

 

Putthe spike after grouting, make sure it’s vertical.

Make sureno oil stain on thespike

6

cleanup

Stick

Removethe overflow material

Grouting again ifthe hole can not full enough

7

Fixthe fastener

T-spanner

After anchoring(60 min), fix the fastener, screw down the nut with hand, after 120min screw down the nut with T-spanner, 24hour screw down tightly asrequired   

 

8

Changethe new railroad

 

Itwill be available after 1 day curing.

It’sbetter to spray water after 1-3 days curing

 

 

Notices:  dosage of eachrail spike ±0.4 kg. 

 

Picture:

 

 

 

 

 

Contact Infomation
Send Inquiry