Description:
extrusion machine:1) Produced pipe:16mm-32mm
2) Output capacity: 300kg/h
3) Good components: Siemens Motor, ABB inverter ..
extrusion machine:
PVC four-outlet pipe extrusionline:
PVC double outletpipe extrusion machines:
PVC 630 pipeextrusion machines:
1Extruder:
Parts | No | Name | Brand |
1.1 Electricparts | 1 | Inverter | Switzerland ABB |
2 | Contactor | Schneider | |
3 | Relay | Schneider | |
4 | Temperaturemeter | RKCmeters | |
5 | Breaker | Delixi | |
| |||
1.2 Drivingparts | 1 | Motor | Siemens ACmotor |
2 | Gearbox | Top brand inChina | |
| |||
1.3 Screw andbarrel | 1 | Technology | Adopt Germantechnology |
2 | Mainmaterials | 38CrMoALA | |
3 | The barrel isequipped with vacuum system | ||
4 | The screw isequipped with thermostat system | ||
5 | Heatingring | Cast aluminumheating ring | |
| |||
1.4 Calibratedfeeding device | 1 | Speedcontroller | ABBinverter |
2 | It is equippedwith stirring device | ||
| |||
1.5 Protectionsystem | 1 | Screwdislocation protection | |
2 | Current overloadprotection | ||
3 | Afull set alarming system | ||
2Mold
No | Name | Specs |
2.1 | Mainmaterials | Mouldsteel |
2.2 | Temperaturecontrol system | Japanese RKCtemperature meter |
2.3 | Partsprocessing | Bythe CNC |
2.4 | Heatingring | Micaheater |
3 Vacuumcalibration tank
No | Name | Specs |
3.1 | Mainmaterial | Stainlesssteel |
3.2 | Water and vacuumpump from shanghai YVHUAN | |
3.3 | Main electricparts | Schneider |
3.4 | Thecalibration tank is equipped with water temperature and vacuumdegree supervising device. | |
4Hauler
No | Name | Specs |
4.1 | Haulingmotor | TECO servomotor |
4.2 | Gearbox | Densen (Germanyjoint venture) |
4.3 | Mainelectrics | Schneiderbrand |
4.4 | Haulingtype | Caterpillartype |
5Cutter
No | Name | Specs |
5.1 | Cuttingtype | Planetarycutter |
5.2 | Controllingsystem | SchneiderPLC |
5.3 | Mainelectric | Schneider |
5.4 | Thecutter is equipped with chamfering device | |
6Stacker:
No | Name | Specs |
6.1 | Mainmaterial | Stainlesssteel |
6.2 | Stackingtype | Autostacking |
7 After salesservice:
7.1Before shipment, we would invite you to come to our factory to testthe machines.
7.2After the machine was shipped to your factory, we would send ourengineer to your factory to install the machine and communicatewith your engineers.
7.3After the installation, we would reply to your problem within 24hours. If you necessary, we would send our engineer to your factoryaccording to your requirements.
JURRYFACTORY:
PARTSPROCESSING:


