Description:
1.Material:P20/3CR13/718/23162.Size:all kin of sizes
3.Runner:cold/hot
4.Good quality
5.Cheaper price
We are Xiong yispecialized in making molding more than20 years
Gerneral moldspecifications:
1.Name: Shovelmould
2.Material of thesteel:P20/718/2316/3CR13, 40Cr, 2738,NAK80, S136 etc
3.Steel of mould base:45#, 50#, P20,etc
4.Nos ofcavity:customized or according to the customers''requirement
5.Hardness ofcavity&core:30-33HRC
6.Hardness of wear parts:30-33HRC
7.Core pullingsystem:motor /oil cylinder/stripping plate, angel, pinetc
8.MouldAccessories:DME/HASCO standard
9:ManufactureProcess:Drawing/sample/product data --Agreement comment--Hand madesample--Design comment--Material purchase and Give productinstuction--Material inspection and Mould design--Electrode processand Prorm--CNC, wire cut, EDM--Quality inspection--Finish machiningcavity, core, jiggle pin--Quality inspectio--Match themoulds--Quality inspection--polishing--Quality innspection--Cauteryveins, plate and Nitrification--Quality inspection--Moulds assembly--Quality inspetion --Try mould--Clientapprobate--Consignation/maufacture
10 Machining center: CNCmilling machine -NC wire cutting -NC-EDM and soon
11 Mould lifetime:500000-1000000 shots, oraccording to the material of steel
12.Downpayment:Usually 40%before we startworking
13.R and D:We offercustomers the drawings for products and mouldstructure
14./confirm/iation:We sendthe drawings to cusomer to confirm and the customers give us somesuggestions
15.Testing :Testing themould to make sure everything is ok
16.Lead time:30-45days
17.imported Steel ensuredthe long service life of the moulds
18.Rowerful coolingsystem ensured the product forming speed
19.Advanced computersimulation technology is adoped to analyze mould runnerdesigning
20.AdvancedHigh-precision equipments, High-class R&D team, and strictquality control managment ensured ensured the mouldquality
1.Quote | According to sample, drawings and size, Providing a reasonable price | |
↓ | ||
2.Discussion | Mold material, cavity number, price, runner, payment and delivery time | |
↓ | ||
3.S/C Signature | Approval for all the items | |
↓ | ||
4. Advance | Pay 40% by T/T advanced | |
↓ | ||
5.Product Design Checking | We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report. | |
↓ | ||
5.Mould Design | We make mould design on the basis of /confirm/ied product design, and send to customer for /confirm/iation. | |
↓ | ||
6.Mold Tooling | We start to make mold after mold design /confirm/ied | |
↓ | ||
7.Mold Processing | Send report to customer once each week | |
↓ | ||
8.Mold Testing | Send trial samples and try-out report to customer for /confirm/iation | |
↓ | ||
9. Mold Modification | According to customer’s feedback | |
↓ |
| |
10.Balance settlement | 60% by T/T after the customer approved the trial sample before shipment | |
↓ |
| |
11.Delivery | Delivery by sea or air. The forwarder can be designated by your side. | |




