Plastic Blowing Molds
2016-12-23 17:38  Views:199
Price:Negotiable
Send Inquiry

Description:

1.Material:P20/3CR13/718/2316
2.Size:all kin of sizes
3.Runner:cold/hot
4.Good quality
5.Cheaper price

 

We are Xiong yispecialized in making molding more than20 years

 

Gerneral moldspecifications:

 

1.Name:  Shovelmould

2.Material of thesteel:P20/718/2316/3CR13, 40Cr, 2738,NAK80, S136 etc

 

3.Steel of mould base:45#, 50#, P20,etc

 

4.Nos ofcavity:customized or according to the customers''requirement

 

5.Hardness ofcavity&core:30-33HRC

 

6.Hardness of wear parts:30-33HRC

 

7.Core pullingsystem:motor /oil cylinder/stripping plate, angel, pinetc

 

8.MouldAccessories:DME/HASCO standard

 

9:ManufactureProcess:Drawing/sample/product data --Agreement comment--Hand madesample--Design comment--Material purchase and Give productinstuction--Material inspection and Mould design--Electrode processand Prorm--CNC, wire cut, EDM--Quality inspection--Finish machiningcavity, core, jiggle pin--Quality inspectio--Match themoulds--Quality inspection--polishing--Quality innspection--Cauteryveins, plate and Nitrification--Quality inspection--Moulds assembly--Quality inspetion --Try mould--Clientapprobate--Consignation/maufacture

 

10 Machining center: CNCmilling machine -NC wire cutting -NC-EDM and soon

 

11 Mould lifetime:500000-1000000 shots, oraccording to the material of steel

 

12.Downpayment:Usually 40%before we startworking

 

13.R and D:We offercustomers the drawings for products and mouldstructure

 

14./confirm/iation:We sendthe drawings to cusomer to confirm and the customers give us somesuggestions

 

15.Testing :Testing themould to make sure everything is ok

 

16.Lead time:30-45days

 

17.imported Steel ensuredthe  long service life of the moulds

 

18.Rowerful coolingsystem ensured the product forming speed

 

19.Advanced computersimulation technology is adoped to analyze mould runnerdesigning

 

20.AdvancedHigh-precision equipments, High-class R&D team, and strictquality control managment ensured ensured the mouldquality

 

 

 

1.Quote

According to sample, drawings and size, Providing a reasonable price

          ↓

2.Discussion

Mold material, cavity number,  price,  runner, payment and delivery time

          ↓

3.S/C Signature

Approval for all the items

          ↓

4. Advance

Pay 40% by T/T advanced

          ↓

5.Product Design Checking

We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report.

          ↓                    

5.Mould Design

We make mould design on the basis of /confirm/ied product design, and send to customer for /confirm/iation.

          ↓

6.Mold Tooling

We start to make mold after mold design /confirm/ied

          ↓

7.Mold Processing

Send report to customer once each week

          ↓

8.Mold Testing

Send trial samples and try-out report to customer for /confirm/iation

          ↓

9. Mold Modification

According to customer’s feedback

          ↓ 

 

10.Balance settlement

60% by T/T after the customer approved the trial sample before shipment

          ↓ 

 

11.Delivery

Delivery by sea or air. The forwarder can be designated by your side.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Contact Infomation
Send Inquiry
Company name:Taizhou Huangyan Xiongyi Plastic Mould Factory
Status:[Offline] [Send message] [Chat]
Business contact:peter shen(Ms.)
Telphone:
Mobile:
Fax:
Area: Caribbean Region-Bermuda
Address:Taizhou Huangyan Houzhuang industrial zone Xiangguang Road