12.0 NON-CONFORMANCE
12.0 General Requirements
The HILEKAN (NIG.) COMPANY Project Quality Assurance coordinator
will establish and implement procedural control identify, report,
review, dispose of and document non-conformance for both HILEKAN
(NIG.) COMPANY scope of work and any sub-contractors scope of work.
Detailed procedural controls will be contained within each project
procedure manual.
Major Vendors and sub-contractors will include a formal
non-conformance system in his Quality control Program and will also
be required to ensure that their Vendors, sub-contractors and
services organization develop and implement a similar formal
non-conformance system. The Quality Assurance manager will review
and approve all non-conformance control procedures.
The following sections address the minimum requirements for
establishing system for control of non-conformance. All sections
and the requirements detailed within this manual will be subject to
Quality Assurance non-conformance corrective action controls.
12.2 Identification and Reporting
A procedure will be implemented not only by HILEKAN (NIG.) COMPANY
but also by major sub-contractors and service organization. HILEKAN
(NIG.) COMPANY non-conformance forms shall be used to document
non-conformance.
12.3 Disposition
The detailed non-conformance procedures shall describe disposition
of non conforming materials and items. The personnel
responsibilities and authorities for the dispositions will be
identified in the procedures. The procedures will contain methods
and instructions for implementing the following dispositions.
Hilekan Nig. Coy