- Container Loading Supervision
- 2016-10-29 09:06
- Container Loading Supervision (abbreviated to CLS), Sometimes is called "container loading check", is the final step in
- Final Random Inspection Service
- 2016-10-26 18:02
- Final Random Inspection(abbreviated to FRI) is a product evaluation at the end stage of production. Normally PSI require
- Initial Factory Evaluation
- 2016-10-24 04:11
- Initial Factory Evaluation (abbreviated to IFE), is an onsite factory evaluation on behalf of you at the manufacturer's